For Perth stormwater drainage design, follow water from inlet, through the network, to the outlet. Stormwater work should explain the complete path from collection to discharge.

Roof downpipe entering a white stormwater junction at ground level
Perth property guidesSite planningStormwater drainageSoakwell options

Request a FREE quote

Form preview · online enquiries are not open yet.

Downpipes: read the system direction on a plan

Ask which downpipes join each branch, which surfaces feed pits or channels, and where the pipe changes direction or crosses another service. Confirm where the line can be inspected. Pipe diameter is a design choice that depends on the flow, gradient and work required; it should not be inferred from another house.

When rain leaves the roof through a downpipe or crosses a paved surface, it needs a route that stays usable under the site's actual levels. A proposed soakwell or connection is only one part of that route.

What to check at the property

  • Site conditions: compare discharge options for your lot

    Infiltration needs suitable ground and site conditions. A connection outside the lot may have separate conditions and cannot be assumed available. Ask the designer or council to confirm the intended destination and explain where water will go if the primary system is exceeded.

Related soakwell and drainage guides

Channel drain design for a garage threshold

Soakwell design for Perth stormwater

Perth council stormwater requirements

Commercial car park drainage design

Concrete soakwell capacity and layout

Modular soakwell layout design

Repairing a stormwater branch to a soakwell

Operated excavation for drainage trenches

As-built drawing: what should be left after installation?

Request an as-built drawing or marked plan of the inlets, route, access points and discharge destination. Ask which surfaces were reinstated, which planned details changed and what maintenance access must remain clear.

Washed drainage gravel and white inlet pipe in a lined stormwater pit

Perth stormwater drainage design: practical checks

Approval: how do you check an outlet that disappears underground?

Treat the destination as unknown until the records or a site assessment confirm it. Give the provider a sketch showing the visible inlets and suspected route. If a council connection is proposed, check that approval separately from whether the existing pipe is suitable.

Concrete soakwell being positioned in a sandy excavation

Get the details together

Use the enquiry form to see which details help describe the site and the work.

View enquiry formQuote checklist
Planning a quotePrepare your site details

Frequently asked questions

What if the proposed pipe route crosses finished paving?

Ask who will assess the crossing and what reinstatement is included. Compare another route if it provides suitable levels and maintenance access.

Do I need to know what happens outside the property?

Know the intended discharge point and the applicable conditions. Do not assume an outlet or connection is available because an asset is nearby.

How should I record a drainage route that may use an outside connection?

Mark the proposed connection as unconfirmed until you have checked the property records and the applicable authority requirements. Show the upstream pits, pipe route and overflow separately. A nearby pit is useful for locating the discussion, but proximity does not establish permission to use it.

How do I show where driveway runoff reaches the stormwater network?

Draw the driveway falls and low points, then mark the first grate or pit that receives the surface runoff. Follow the underground route from there or label the next destination as unknown. Show the garage threshold and where water could go if the first collection point is full.

What makes an as-built stormwater drawing useful after landscaping?

An as-built stormwater drawing should show the final locations of downpipes, pits, connecting pipework and inspection covers. Add fixed references such as a wall or boundary, and mark retained or uncertain parts. Keep the drawing with dated photographs before landscaping makes the buried route difficult to locate.